Workforce Overview

The Workforce page provides a visual timeline for scheduling which crew members work on which projects each day.

Timeline View

The Workforce page displays a horizontal timeline showing assignments across a 2-week or month view. You can:

  • Navigate using Previous/Next arrows or jump to Today
  • Switch views between Projects (see who’s on each project) and People (see where each person is assigned)
  • Expand the timeline to full width for easier viewing

Creating Assignments

Admins and Managers can create work assignments:

  1. Click + New Assignment (or click directly on an empty cell in the timeline)
  2. Select a team member
  3. Select a project
  4. Set the date range (start and end date)
  5. Choose a time slot: Full Day, AM, or PM
  6. Optionally set a default cost code for clock-in
  7. Add notes if needed
  8. Click Create Assignment

When you assign someone to a project, they’re automatically added to that project’s team if not already a member.

Assignment Details

Each assignment includes:

FieldDescription
Team MemberWho is assigned
ProjectWhere they’re working
Date RangeStart and end dates (up to 90 days)
Time SlotFull Day, AM, or PM
StatusConfirmed or Tentative
Cost CodeOptional default for mobile clock-in
NotesOptional additional information

Double-Booking Warnings

LogLoon automatically detects when a team member is scheduled for multiple projects on the same day. Warnings appear at the top of the page so you can resolve conflicts.

Note: AM + PM assignments on the same day for different projects are allowed (split shifts).

Permissions

RoleCan ViewCan Create/Edit/Delete
Admin / ManagerYesYes
Field WorkerYes (read-only)No